Engineering, construction and management of infrastructure and fibre since 2017 info@vu-infra.nl
Holiday parks

Complete infrastructure for chalet and holiday parks

Sewer, water, gas, power, fibre, coax, wifi and smart sub-meters. We design and build the complete underground infrastructure and then manage the whole park: fibre, coax, gas, water, power and sewer, with one fault service.

Van Uden Infra vans
What we offer

One party for the whole park

Park developers and operators prefer one contractor that handles the park's infrastructure from drawing to management over five parties waiting for each other. That is exactly what we offer, right up to the garden around the chalet.

Sewer and water

Foul water sewer with manholes and a connection per plot, water main with meter pits. In the same trench as the rest.

Gas and power

Propane network or gas connection, power cables, section cabinets and a meter cupboard per plot, plus site lighting.

Fibre per chalet

Own fibre network on the park with a connection per chalet, plot or lodge. Ready for any provider.

Wifi on the park

Full-coverage wifi network for guests and management, based on the fibre infrastructure. Centrally managed.

Smart sub-meters

Read and bill electricity and water consumption per chalet remotely. No more meter readings on the park.

Landscaping per chalet

Paving, planting, lawn and fencing around the chalet, delivered together with the connections. So the chalet is immediately ready for the buyer or tenant.

Phasing

Building along with the development of the park

New parks are built in phases. We build the main infrastructure so that subsequent phases can connect without rework, and we work together with the civil contractor doing the earthworks.

  • Design of the main structure for the whole park, construction per phase
  • Coordination with earthworks contractor, utilities and chalet supplier
  • Handover per chalet, including a working connection
  • After handover: management of fibre, coax, gas, water, power and sewer, fault service and extension for new phases
References
North Holland
Beach Resorts Noorderduyn, Ursem
Complete infrastructure for 450 chalets, including smart sub-meters, with management of the park after handover. Extension with around 300 chalets planned for 2027.
North Brabant
Chalet park Baarle-Nassau
Infrastructure for 87 chalets in two phases, in cooperation with the park's civil contractor.
Germany

Also for parks in Germany

For German parks and resorts we work through Sparkwire Netzbau GmbH in Aachen. Since February 2026 new buildings in Germany must be delivered fibre-ready. We arrange the infrastructure so the park complies.

More about Sparkwire Netzbau
Van Uden Infra logo on a van

Want to discuss a project or network?

Send a short description to info@vu-infra.nl. Within one working day we reply with a concrete proposal for a meeting.